April 20-23: Radix Exhibiting at Data Center World
Radix is heading to Data Center World, and we’re excited to connect with industry leaders and innovators shaping the future of critical infrastructure. From April …
March 4: New York Fire Alarm Association (NYFAA) Annual Vendor Show
Come visit us at the NYFAA Annual Vendor Show. The Radix DuraLife team will be on hand to answer any questions about our growing DuraLife 2-Hour …
March 10-11: 2026 SFPE Greater Atlanta Annual Fire Safety Conference & Expo
Come visit us at the 2026 SFPE Greater Atlanta Annual Fire Safety Conference & Expo. The DuraLife team will be on hand to answer any …
Radix Fire Protection & Cable Product Video
Radix Wire’s DuraLife® brand cables are UL 2196 / CAN-ULC S139 two-hour certified and meet the mandatory NFPA 72: National Fire Alarm and Signaling Code pathway survivability circuit requirements.
Circuit Integrity Solutions for NFPA 502
This week we will be exploring some of the uses of circuit integrity solutions for use in accordance with NFPA 502: Standard for Road Tunnels, …
Circuit Integrity Solutions for Critical Operations Facilities (COPS)
This week we will be exploring some of the uses of circuit integrity solutions for critical operations facilities (COPS). The electrical installation requirements for these …
Wheatland FasTrak ® Plus Electrical Metallic Tubing (EMT)
Last week we began a three-part series covering some of the most commonly asked questions we encounter in the field regarding our electrical circuit integrity …
Compression Couplings or Set-screw Fittings?
While meeting with electrical contractors and fire-alarm vendors during my travels, great discussion surrounds electrical circuit integrity systems and meeting and maintaining UL 2196 & …
NEW DuraLife® FPL Certified Hardware and Components Data Sheet
Radix Wire’s DuraLifeTM FPL Cables are part of a complete electrical circuit integrity system tested and certified compliant under the UL 2196 standard for fire-resistive cables. Circuit Integrity …
Electrical Circuit Integrity Systems Applications
Where are 2-hour fire-rated electrical circuit integrity systems typically located? “These systems are primarily installed in mixed occupancy high-rise buildings, and in tunnels, bridges, and …


